Density Test Report

Date :12/20/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/20/2023 8:30
Onsite Hours :03:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/20/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/20/2023 1 16.6 106.5 24209 111.6 16.5 95.4 95 D6938 Pass
Location : 9 feet south of retaining wall 7, , Elv/Depth :14 feet below finished grade
Comment : Gauge Serial No. :85759
12/20/2023 2 16.1 106.6 24209 111.6 16.5 95.5 95 D6938 Pass
Location : 13 feet south of the middle of retaining wall 7,, Elv/Depth :13 feet below finished grade
Comment : Gauge Serial No. :85759
12/20/2023 3 13.9 103.7 24209 111.6 16.5 92.9 90 D6938 Pass
Location : Sewer line, 175 feet north of MH 1B,, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 20, 2023