Skip to content

Density Test Report

Date :12/21/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/21/2023 8:30
Onsite Hours :05:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/21/2023 13:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/21/2023 1 15.5 105.5 24209 111.6 16.5 94.5 90 D6938 Pass
Location : 18 feet east of MHB4., Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :
12/21/2023 2 15.9 106.6 24209 111.6 16.5 95.5 90 D6938 Pass
Location : 89 feet west of MH B5., Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 21, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024