- Home
- Density Test Report Report ID: 63483
- Edit Download Report
Density Test Report
Date :12/21/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/21/2023 8:30
Onsite Hours :05:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/21/2023 13:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
12/21/2023 | 1 | 15.5 | 105.5 | 24209 | 111.6 | 16.5 | 94.5 | 90 | D6938 | Pass |
Location : | 18 feet east of MHB4., Elv/Depth :4 feet below finished grade | |||||||||
Comment : | Gauge Serial No. : | |||||||||
12/21/2023 | 2 | 15.9 | 106.6 | 24209 | 111.6 | 16.5 | 95.5 | 90 | D6938 | Pass |
Location : | 89 feet west of MH B5., Elv/Depth :5 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, December 21, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024