Density Test Report

Date :12/22/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/22/2023 8:00
Onsite Hours :04:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/22/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/22/2023 1 19.5 100.9 24209 111.6 16.5 90.4 90 D6938 Pass
Location : 22 feet north of MH 1F., Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
12/22/2023 2 14.7 106.0 24209 111.6 16.5 95.0 90 D6938 Pass
Location : 25 feet north of MH G1., Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 22, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024