Density Test Report

Date :01/22/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :01/22/2024 9:00
Onsite Hours :10:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :01/22/2024 19:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/22/2024 1 17.1 108.7 24209 111.6 16.5 97.4 95 D6938 Pass
Location : backfill for retaining wall 7, Elv/Depth :6 feet from top of wall
Comment : Gauge Serial No. :85759
01/22/2024 2 16.6 107.9 24209 111.6 16.5 96.7 95 D6938 Pass
Location : backfill for retaining wall 7., Elv/Depth :6 feet from top of wall
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 22, 2024
Reviewer Name / DateKenneth Mosman, March 10, 2024