Skip to content

Daily Field Report

Date :02/01/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :02/01/2024 13:00
Onsite Hours :03:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :02/01/2024 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • The placement and compaction of backfill soils for the water line in the front of Lot #13 and Lot #14, continued this day.
  • At the time of arrival, our representative observed that work was in progress with 8 inches lifts being placed, compacted using a trench compactor.
  • Density test results indicate that the compacted materials met the project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698). 
  • Excavation for the footing of retaining wall 7 in progress.
  • Performed probe rod tests in serval locations for subgrade of accel lane (roadway).

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, February 1, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024