Density Test Report

Date :02/02/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/02/2024 13:00
Onsite Hours :03:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :02/02/2024 16:30
ASEC Technician Name :

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/02/2024 1 23.3 94.6 4 98.6 20.2 95.9 95 D6938 Pass
Location : Lot #51, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
02/02/2024 2 26.2 97.7 4 98.6 20.2 99.1 95 D6938 Pass
Location : Lot #50, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
02/02/2024 3 28.3 89.6 5 93.8 20.9 95.5 95 D6938 Pass
Location : Lot #20, Elv/Depth :2 feet below finished grade
Comment : Soil moisture content measured more than 2 percent over optimum moisture content. Gauge Serial No. :85759
02/02/2024 4 26.9 89.2 5 93.8 20.9 95.1 90 D6938 Pass
Location : lot#19, Elv/Depth :2 feet below finish grade
Comment : Soil moisture content measured more than 2 percent over optimum moisture content. Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 2, 2024
Reviewer Name / DateKenneth Mosman, March 10, 2024