- Home
- Density Test Report Report ID: 63971
- Edit Download Report
Density Test Report
Date :02/03/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/03/2024 14:30
Onsite Hours :02:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :02/03/2024 16:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
02/03/2024 | 1 | 26.7 | 87.5 | 5 | 93.8 | 20.9 | 93.3 | 90 | D6938 | Pass |
Location : | Lot #18, Elv/Depth :2 feet below finished grade | |||||||||
Comment : | Moisture contents more than 3 percent over optimum | Gauge Serial No. :85759 | ||||||||
02/03/2024 | 2 | 28.6 | 89.6 | 4 | 98.6 | 20.2 | 90.9 | 90 | D6938 | Pass |
Location : | Lot #19, Elv/Depth :2 feet below finished grade | |||||||||
Comment : | Moisture contents more than 3 percent over optimum | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, February 3, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024