- Daily Field Report Report ID: 63976
- Edit Download Report
Daily Field Report
Date :02/05/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :02/05/2024 8:30
Onsite Hours :03:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :02/05/2024 11:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- We recommended to the contractor to undercut unsuitable soils from various locations in the retaining wall 7 footing.
- Observed undercutting, backfilling and compaction with suitable soils, using a trench compactor.
Technician Signature / DateAminullah Azimi, February 5, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024