Density Test Report

Date :02/05/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/05/2024 15:00
Onsite Hours :02:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :02/05/2024 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/05/2024 1 28.2 114.3 4 98.6 20.2 90.5 95 D6938 Fail
Location : Lot #19 , Elv/Depth :6 inches below finished grade
Comment : Moisture content more than 3 percent higher of optimum moisture content Gauge Serial No. :85759
02/05/2024 2 24.1 95.8 4 98.6 20.2 97.2 95 D6938 Pass
Location : Lot #20, Elv/Depth :6 inches below finished grade
Comment : Moisture content more than 3 percent higher of optimum moisture content Gauge Serial No. :85759
02/05/2024 3 25.3 94.9 4 98.6 20.2 96.2 95 D6938 Pass
Location : Basement for Lot #20, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 5, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024