Density Test Report

Date :02/06/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/06/2024 15:00
Onsite Hours :02:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :02/06/2024 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/06/2024 1 28 89.8 4 98.6 20.2 91.1 95 D6938 Fail
Location : Lot #20, Elv/Depth :2 feet below finished grade
Comment : Moisture content 3 percent more than optimum moisture content. Gauge Serial No. :85759
02/06/2024 2 19.8 94.4 3 99.4 21.3 95.0 95 D6938 Fail
Location : Basement of Lot #20, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
02/06/2024 3 27.1 120.0 3 99.4 21.3 95.0 95 D6938 Fail
Location : Basement for Lot #19, Elv/Depth :1 foot below finished grade
Comment : Moisture content 3 percent more than optimum moisture content. Gauge Serial No. :85759
02/06/2024 4 28.7 91.1 2 95.0 23.5 95.9 95 D6938 Pass
Location : Lot #20, Elv/Depth :1 foot below finished grade
Comment : Moisture content 3 percent more than optimum moisture content. Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 6, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024