Skip to content

Density Test Report

Date :02/07/2024
Project No :2023C141
Client Company :Toll Bros
Arrival Time :02/07/2024 8:30
Onsite Hours :04:00
Name of the Project :N. Gate - Old Atlanta Road
Project Location :Cumming
Weather :sunny
Departure Time :02/07/2024 12:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/07/2024 1 15.7 104.1 24468 111.3 17.5 93.5 90 D6938 Pass
Location : Creek crossing (location shown in pictures), Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
02/07/2024 2 15.9 105.7 24468 111.3 17.5 95.0 90 D6938 Pass
Location : Creek crossing (location shown in pictures), Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
02/07/2024 3 17.9 102.0 24469 103.9 18.7 98.2 90 D6938 Pass
Location : Creek crossing (location shown in pictures), Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
02/07/2024 4 16.9 101.2 24469 103.9 18.7 97.4 90 D6938 Pass
Location : Sewer pipe trench between manholes B1 to A4, Elv/Depth :7 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 7, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024