- Home
- Density Test Report Report ID: 64063
- Edit Download Report
Density Test Report
Date :02/08/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/08/2024 8:30
Onsite Hours :03:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :02/08/2024 11:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
02/08/2024 | 1 | 28.7 | 85.9 | 2 | 95.0 | 23.5 | 90.4 | 95 | D6938 | Fail |
Location : | Lot #21, Elv/Depth :6 feet below finished grade | |||||||||
Comment : | Moisture content more than 3 percent over optimum moisture content | Gauge Serial No. :85759 | ||||||||
02/08/2024 | 2 | 29 | 86.2 | 2 | 95.0 | 23.5 | 90.7 | 95 | D6938 | Fail |
Location : | Lot #22, Elv/Depth :6 feet below finished grade | |||||||||
Comment : | Moisture content more than 3 percent over optimum moisture content | Gauge Serial No. :85759 | ||||||||
02/08/2024 | 3 | 29.3 | 85.3 | 1 | 83.2 | 25.3 | 102.5 | 95 | D6938 | Pass |
Location : | Lot #23, Elv/Depth :5 feet below finished grade | |||||||||
Comment : | Moisture content more than 3 percent over optimum moisture content | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, February 8, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024