Skip to content

Density Test Report

Date :02/15/2024
Project No :2023C141
Client Company :Toll Bros
Arrival Time :02/15/2024 8:30
Onsite Hours :04:30
Name of the Project :N. Gate - Old Atlanta Road
Project Location :Cumming
Weather :sunny
Departure Time :02/15/2024 13:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/15/2024 1 20.1 103.9 24469 103.9 18.7 100.0 95 D6938 Pass
Location : Lot #25, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
02/15/2024 2 14.8 103.0 24469 103.9 18.7 99.1 95 D6938 Pass
Location : Roadway in the front of Lot #25, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
02/15/2024 3 14.3 101.3 24469 103.9 18.7 97.5 95 D6938 Pass
Location : Lot #32, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :85759
02/15/2024 4 22 104.0 24469 103.9 18.7 100.1 95 D6938 Pass
Location : Roadway in front of Lot #32, Elv/Depth :1 foot below finished grade
Comment : Moisture content more than 3 percent over optimum Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 15, 2024
Reviewer Name / DateKenneth Mosman, March 12, 2024