- Home
- Density Test Report Report ID: 64179
- Edit Download Report
Density Test Report
Date :02/15/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/15/2024 13:00
Onsite Hours :03:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :02/15/2024 16:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
02/15/2024 | 1 | 24.6 | 85.8 | 1 | 83.2 | 25.3 | 103.1 | 95 | D6938 | Pass |
Location : | Lot #32, Elv/Depth :5 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
02/15/2024 | 2 | 24.3 | 85.5 | 1 | 83.2 | 25.3 | 102.8 | 95 | D6938 | Pass |
Location : | Lot #22, Elv/Depth :6 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
02/15/2024 | 3 | 28.2 | 87.8 | 1 | 83.2 | 25.3 | 105.5 | 95 | D6938 | Pass |
Location : | Roadway in front of Lot #32, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, February 15, 2024
Reviewer Name / DateKenneth Mosman, March 12, 2024