Skip to content

Density Test Report

Date :02/17/2024
Project No :2023C141
Client Company :Toll Bros
Arrival Time :02/17/2024 13:00
Onsite Hours :03:00
Name of the Project :N. Gate - Old Atlanta Road
Project Location :Cumming
Weather :sunny
Departure Time :02/17/2024 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/17/2024 1 16.1 114.6 24469 103.9 18.7 95.0 95 D6938 Fail
Location : 25 feet NW of MH A5, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :85759
02/17/2024 2 16.1 101.9 24469 103.9 18.7 98.1 95 D6938 Pass
Location : 35 feet SE of MH A6, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :85759
02/17/2024 3 17.6 102.7 24469 103.9 18.7 98.8 90 D6938 Pass
Location : Lot #25, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 17, 2024
Reviewer Name / DateKenneth Mosman, March 13, 2024