- Density Test Report Report ID: 64413
- Edit Download Report
Density Test Report
Date :02/23/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :02/23/2024 8:00
Onsite Hours :05:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :cloudy
Departure Time :02/23/2024 13:00
ASEC Technician Name :
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
02/23/2024 | 1 | 19.1 | 96.0 | SC | 94.6 | 21.9 | 101.5 | 100 | D6938 | Pass |
Location : | Roadway between Lots #36 and #38, Elv/Depth :finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
02/23/2024 | 2 | 19.1 | 98.1 | SC | 94.6 | 21.9 | 103.7 | 100 | D6938 | Pass |
Location : | Roadway in front of Lot #40, Elv/Depth :finished grade | |||||||||
Comment : | Gauge Serial No. :85759 | |||||||||
02/23/2024 | 3 | 19.2 | 98.0 | SC | 94.6 | 21.9 | 103.6 | 100 | D6938 | Pass |
Location : | Roadway between Lot #1 and #25, Elv/Depth :finished grade | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, February 23, 2024
Reviewer Name / DateRamchandra Mogulla, June 18, 2024