- Daily Field Report Report ID: 64429
- Edit Download Report
Daily Field Report
Date :02/23/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/23/2024 15:30
Onsite Hours :01:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :cloudy
Departure Time :02/23/2024 17:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- The placement and compaction of fill soils for Lot #48 and Lot #49, continued this day.
- At the time of arrival, lift thickness was not observed as soil was placed and compacted prior to arrival. Fill was compacted using a sheeps-foot (CP56B) compactor.
- Density test results indicate that the compacted materials met the project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698),
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateAminullah Azimi, February 23, 2024
Reviewer Name / DateKenneth Mosman, March 15, 2024