Daily Field Report

Date :02/27/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :02/27/2024 8:30
Onsite Hours :03:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :cloudy
Departure Time :02/27/2024 11:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • A proof-roll observation was performed for the deceleration lane.
  • A fully loaded tandem-axle water truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.
  • No severe yielding and/or deflection was observed during the proof-roll.
  • Performed density tests on soil cement for roadway between Lots #13 and #32, between Lot #14 and Lot #33 and between Lot #34 and retaining wall 7.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateAminullah Azimi, February 27, 2024
Reviewer Name / DateKenneth Mosman, March 28, 2024