Skip to content

Density Test Report

Date :02/27/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :02/27/2024 11:30
Onsite Hours :03:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :cloudy
Departure Time :02/27/2024 15:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
02/27/2024 1 23.6 98.0 4 98.6 20.2 99.4 95 D6938 Pass
Location : Roadway in front of Lot #50, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
02/27/2024 2 27.6 87.2 1 83.2 25.3 104.8 95 D6938 Pass
Location : Roadway in front of Lot #49, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
02/27/2024 3 23.8 98.3 4 98.6 20.2 99.7 95 D6938 Pass
Location : Roadway in front of Lot #48, Elv/Depth :1 foot below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, February 27, 2024
Reviewer Name / DateKenneth Mosman, March 16, 2024