Density Test Report

Date :03/12/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :03/12/2024 12:00
Onsite Hours :04:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Sunny
Departure Time :03/12/2024 16:00
ASEC Technician Name :Ramchandra Mogulla

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/12/2024 1 24.7 91.6 4 98.6 20.2 92.9 95 D6938 Fail
Location : Lot #34, Elv/Depth :3 feet below finished grade
Comment : Moisture content more than 3 percent over optimum moisture content Gauge Serial No. :25988
03/12/2024 2 21.4 94.9 4 98.6 20.2 96.2 95 D6938 Pass
Location : Lot #33, Elv/Depth :
Comment : Gauge Serial No. :25988
03/12/2024 3 14.2 124.2 3 99.4 21.3 124.9 95 D6938 Pass
Location : Lot #31, Elv/Depth :3 feet below finished grade
Comment : Possible rock in the fill caused higher reading Gauge Serial No. :29588
03/12/2024 4 24.3 82.2 1 83.2 25.3 98.8 95 D6938 Pass
Location : Lot #50, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :29588
03/12/2024 5 19.6 91.8 4 98.6 20.2 93.1 95 D6938 Fail
Location : Lot #50, Elv/Depth :
Comment : Gauge Serial No. :29588
Technician Signature / DateRamchandra Mogulla, March 12, 2024
Reviewer Name / DateKenneth Mosman, March 17, 2024