Density Test Report

Date :03/14/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :03/14/2024 8:00
Onsite Hours :05:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :03/14/2024 13:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/14/2024 1 17.3 108.2 0 Infinity D6938 Pass
Location : location shown in picture , Elv/Depth :finished grade
Comment : need proctor for result Gauge Serial No. :85759
03/14/2024 2 18.7 96.6 24208 110.4 16.3 87.5 90 D6938 Fail
Location : location shown in picture , Elv/Depth :finished grade
Comment : need proctor for result Gauge Serial No. :85759
03/14/2024 3 17.5 88.6 Infinity D6938 Pass
Location : location shown in picture, Elv/Depth :finished grade
Comment : need proctor from lab for result Gauge Serial No. :85759
03/14/2024 4 18.5 101.4 Infinity D6938 Pass
Location : location shown in picture, Elv/Depth :1 foot below finish grade
Comment : need proctor from lab to result Gauge Serial No. :85759
03/14/2024 5 17.1 102.9 Infinity D6938 Pass
Location : location shown in picture , Elv/Depth :1 foot below finish grade
Comment : need proctor from lab to result Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 14, 2024
Reviewer Name / DateKenneth Mosman, March 28, 2024