Skip to content

Density Test Report

Date :03/18/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :03/18/2024 13:30
Onsite Hours :02:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :03/18/2024 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/18/2024 1 24.9 95.6 3 99.4 21.3 96.2 95 D6938 Pass
Location : Lot #32, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
03/18/2024 2 22.1 96.7 3 99.4 21.3 97.3 95 D6938 Pass
Location : Lot #34, Elv/Depth :4.5 feet below finished grade
Comment : Gauge Serial No. :85759
03/18/2024 3 23.2 92.0 2 95.0 23.5 96.8 95 D6938 Pass
Location : Lot #35, Elv/Depth :5 feet below finished grade
Comment : Gauge Serial No. :85759
03/18/2024 4 23.5 110.0 5 93.8 20.9 95.0 95 D6938 Fail
Location : Lot #20, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
03/18/2024 5 23.4 92.9 2 95.0 23.5 97.8 95 D6938 Pass
Location : Lot #19, Elv/Depth :1.5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 18, 2024
Reviewer Name / DateKenneth Mosman, March 28, 2024