Skip to content

Density Test Report

Date :03/21/2024
Project No :2021C002
Client Company :CW Matthews
Arrival Time :03/21/2024 7:30
Onsite Hours :06:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :sunny
Departure Time :03/21/2024 13:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/21/2024 1 9.4 119.2 9 120.8 11.3 98.7 95 D6938 Pass
Location : Bend 11 or STA 7005+30.86, Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :85759
03/21/2024 2 10.5 130.5 9 120.8 11.3 97.8 95 D6938 Pass
Location : Bend 11 or STA 7005+30.86, Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
03/21/2024 3 11.2 119.9 9 120.8 11.3 99.3 95 D6938 Pass
Location : Bend 11 or STA 7005+30.86, Elv/Depth :2.5 feet below finished grade
Comment : Gauge Serial No. :85759
03/21/2024 4 8 120.5 9 120.8 11.3 99.8 95 D6938 Pass
Location : Bend 11 or STA 7005+30.86, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 21, 2024
Reviewer Name / DateKenneth Mosman, March 28, 2024