Skip to content

Density Test Report

Date :03/29/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :03/29/2024 8:30
Onsite Hours :07:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Sunny
Departure Time :03/29/2024 15:30
ASEC Technician Name :Fawad Shagiwal

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/29/2024 1 27.7 93.0 2 95.0 23.5 97.9 95 D6938 Pass
Location : Backfilling area of Mechanically Stabilized Earth (MSE) Retaining wall at the vicinity of lot# 27., Elv/Depth :4.5 feet above from the beneath of Mechanically Stabilized Earth (MSE) Retaining wall.
Comment : Gauge Serial No. :3430
03/29/2024 2 19.3 100.2 3 99.4 21.3 100.8 95 D6938 Pass
Location : Backfilling area of Mechanically Stabilized Earth (MSE) Retaining wall at the vicinity of lot# 28., Elv/Depth :4.5 feet above from the beneath of Mechanically Stabilized Earth (MSE) Retaining wall.
Comment : Gauge Serial No. :3430
Technician Signature / DateFawad Shagiwal, March 29, 2024