Density Test Report

Date :03/27/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :03/27/2024 11:00
Onsite Hours :05:30
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :03/27/2024 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/27/2024 1 15.3 106.7 24209 111.6 16.5 95.6 90 D6938 Pass
Location : Storm line, 32 feet to NE of MH 16 B, Elv/Depth :2.5 feet below finish grade
Comment : Gauge Serial No. :85759
04/27/2024 2 18.5 101.4 24209 111.6 16.5 90.9 90 D6938 Pass
Location : Storm pipe, 28 feet to SW of MH 16C,, Elv/Depth :1.5 feet below finish grade
Comment : Gauge Serial No. :85759
04/27/2024 3 16.2 104.0 24209 111.6 16.5 93.2 90 D6938 Pass
Location : Storm line, 41 feet to NE of MH 16B,, Elv/Depth :1 foot below finish grade
Comment : Gauge Serial No. :85759
04/27/2024 4 15.9 104.1 24209 111.6 16.5 93.3 90 D6938 Pass
Location : 45 feet to SW of MH 16C,, Elv/Depth :finish grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 27, 2024
Reviewer Name / DateRamchandra Mogulla, April 11, 2024