Skip to content

Density Test Report

Date :04/01/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :04/01/2024 08:30
Onsite Hours :07:00
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Cloudy
Departure Time :04/01/2024 15:30
ASEC Technician Name :Fawad Shagiwal

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/01/2024 01 23.5 96.7 2 95.0 23.5 101.8 95 D6938 Pass
Location : Lot #26, Elv/Depth :9 Feet from the bottom of the MSE wall
Comment : Gauge Serial No. :3430
04/01/2024 02 22.6 90.2 5 93.8 20.9 96.2 95 D6938 Pass
Location : Lot #28, Elv/Depth :9 feet from the bottom of the MSE wall
Comment : Gauge Serial No. :3430
Technician Signature / DateFawad Shagiwal, April 1, 2024
Reviewer Name / DateKenneth Mosman, April 25, 2024