Skip to content

Density Test Report

Date :04/05/2024
Project No :2023C141
Client Company :Toll Bros
Arrival Time :04/05/2024 09:00
Onsite Hours :07:00
Name of the Project :N. Gate - Old Atlanta Road
Project Location :Cumming
Weather :Sunny
Departure Time :04/05/2024 16:00
ASEC Technician Name :Fawad Shagiwal

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/05/2024 01 17.2 97.3 24469 103.9 18.7 93.6 90 D6938 Pass
Location : Ditch behind Lot #53, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :3430
04/05/2024 02 24.6 93.9 24469 103.9 18.7 90.4 90 D6938 Pass
Location : Ditch behind the Lot #52, Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :3430
Technician Signature / DateFawad Shagiwal, April 5, 2024
Reviewer Name / DateKenneth Mosman, April 25, 2024