Date :04/11/2024
Project No :2022C106
Client Company :CWM
Arrival Time :04/11/2024 8:00
Onsite Hours :08:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :sunny
Departure Time :04/11/2024 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/11/2024 1 8 121.4 Infinity D6938 Pass
Location : storm water line, 9 feet to North from MH A-2, Elv/Depth :3 feet below finish grade
Comment : need add M10 proctor for result Gauge Serial No. :85759
04/11/2024 2 8.7 119.0 Infinity D6938 Pass
Location : storm water line, 65 feet to south from A-4,, Elv/Depth :2 feet below finish grade
Comment : Need to add M10 proctor in the system for result. Gauge Serial No. :85759