Date :04/22/2024
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :04/22/2024 02:30
Onsite Hours :03:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :Sunny
Departure Time :04/22/2024 06:00
ASEC Technician Name :Fawad Shagiwal

Observations/Finding

As requested the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.

The following observations were observed on the site this day.

  • 02-layers of 20096 cubic feet rocks was placed and compacted in temporary pond between lots# 19 and 20 using Excavator (PC390LC) equipment.
  • 01-layer of 10000 cubic feet dirt or soil was placed and compacted at the top of each layer of rocks in temporary pond between lots# 19 and 20.

Technician Signature / DateFawad Shagiwal, April 22, 2024