- Home
- Density Test Report Report ID: 66675
- This project is inactive from admin. Download Report
Density Test Report
Date :05/21/2024
Project No :2022C106
Client Company :CWM
Arrival Time :05/21/2024 11:00
Onsite Hours :04:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :sunny
Departure Time :05/21/2024 15:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 05/21/2024 | 1 | 4 | 132.0 | GAB 1 | 135.6 | 6.8 | 97.3 | 95 | D6938 | Pass |
| Location : | Shoulder of NLVR, N: 9278.6 E: 138525., Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
| 05/21/2024 | 2 | 3.8 | 131.4 | GAB 1 | 135.6 | 6.8 | 96.9 | 95 | D6938 | Pass |
| Location : | Shoulder of NLVR, N: 9279.4 E: 13785.2, Elv/Depth :finished grade | |||||||||
| Comment : | Gauge Serial No. :38069 | |||||||||
Technician Signature / DateAminullah Azimi, May 21, 2024
Reviewer Name / DateKenneth Mosman, July 12, 2024
