Skip to content

Density Test Report

Date :09/25/2024
Project No :2024C168
Client Company :CCG
Arrival Time :09/25/2024 10:00
Onsite Hours :05:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :cloudy
Departure Time :09/25/2024 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/25/2024 131 26.6 87.4 26082 94.1 24.3 92.9 95 D2937 Fail
Location : Storm water trench, 10 feet SW from MHA4.2, Elv/Depth :1 foot below finished grade
Comment : contractor informed of failing test. requested recompaction and retesting
09/25/2024 132 25.6 87.8 26082 94.1 24.3 93.3 95 D2937 Fail
Location : Storm water trench, 11 feet NE from MHA4.2, Elv/Depth :2.5 feet below finished grade
Comment : contractor informed of failing test. requested recompaction and retesting
09/25/2024 133 26.5 87.0 26082 94.1 24.3 92.5 95 D2937 Fail
Location : Storm water trench, 10 feet NE from MHA4.3, Elv/Depth :finished grade
Comment : contractor informed of failing test. requested recompaction and retesting
Technician Signature / DateAminullah Azimi, September 25, 2024
Reviewer Name / DateKenneth Mosman, October 20, 2024