Skip to content

Density Test Report

Date :11/11/2024
Project No :2024C168
Client Company :CCG
Arrival Time :11/11/2024 8:15
Onsite Hours :08:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :11/11/2024 16:45
ASEC Technician Name :

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/11/2024 303 23.6 98.2 26081 102.9 20.0 95.4 95 D2937 Pass
Location : water line, in front of Lot #217, Elv/Depth :finished grade
Comment :
11/11/2024 304 27.7 91.4 26082 94.1 24.3 97.1 95 D2937 Pass
Location : water line, in front of Lot #213, Elv/Depth :1 foot below finished grade
Comment :
11/11/2024 305 21.6 99.3 26081 102.9 20.0 96.5 95 D2937 Pass
Location : water line, in front of Lot #193, Elv/Depth :1 foot below finished grade
Comment :
11/11/2024 306 25.6 91.6 26082 94.1 24.3 97.3 95 D6938 Pass
Location : Lot #1, Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
11/11/2024 307 23.5 92.1 26082 94.1 24.3 97.9 95 D6938 Pass
Location : Lot #2, Elv/Depth :0.5 foot below finished grade
Comment : Gauge Serial No. :85759
11/11/2024 308 23.1 100.0 26081 102.9 20.0 97.2 95 D6938 Pass
Location : Lot #3, Elv/Depth :finished grade
Comment : Gauge Serial No. :85759
11/11/2024 309 21.1 100.4 26081 102.9 20.0 97.6 95 D6938 Pass
Location : Lot #4, Elv/Depth :0.5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, November 11, 2024
Reviewer Name / DateKenneth Mosman, January 11, 2025