Skip to content

Density Test Report

Date :11/13/2024
Project No :2024C168
Client Company :CCG
Arrival Time :11/13/2024 12:00
Onsite Hours :06:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :11/13/2024 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
11/13/2024 314 20.0 100.3 26081 102.9 20.0 97.5 95 D2937 Pass
Location : water line, in front of Lot #318, Elv/Depth :2foot below finished grade
Comment :
11/13/2024 315 22.0 98.9 26081 102.9 20.0 96.1 95 D2937 Pass
Location : water line, in front of Lot #240, Elv/Depth :1 foot below finished grade
Comment :
11/13/2024 316 19.2 100.4 26081 102.9 20.0 97.6 95 D2937 Pass
Location : water line, in front of Lot #218, Elv/Depth :1.5 foot below finished grade
Comment :
11/13/2024 317 24.9 90.7 26082 94.1 24.3 96.4 95 D2937 Pass
Location : water line, in front of Lot #239, Elv/Depth :0.5 foot below finished grade
Comment :
Technician Signature / DateAminullah Azimi, November 13, 2024
Reviewer Name / DateKenneth Mosman, January 11, 2025