- Home
- Density Test Report Report ID: 73482
- Edit Download Report
Density Test Report
Date :11/22/2024
Project No :2024C202
Client Company :CCG
Arrival Time :11/22/2024 07:15
Onsite Hours :
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :Partly cloudy
Departure Time :
ASEC Technician Name :Solomon Cherie
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 11/22/2024 | 109 | 25.9 | 0.0 | S-02 | 97.2 | 24.9 | 0.0 | D6938 | Pass | |
| Location : | Downcut location, Elv/Depth : | |||||||||
| Comment : | The purpose of this test is to check moisture content of the dirt at the down cut or dirt quarry. So, the moisture is good when compared to the proctor as shown above. | Gauge Serial No. :30942 | ||||||||
Technician Signature / DateSolomon Cherie, November 22, 2024
Reviewer Name / DateKenneth Mosman, January 09, 2025
