Skip to content

Daily Field Report

Date :12/13/2024
Project No :2024C168
Client Company :CCG
Arrival Time :12/13/2024 11:30
Onsite Hours :06:00
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :12/13/2024 17:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding


As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

Observation Report

  • Retaining Wall Stabilization:
    The contractor stabilized the retaining wall footing by adding 2 feet of riprap and 6 inches of No. 57 stone under the footing between Station 1+42 and Station 2+28.
  • Water Line Work:
    One crew was working on the water line in front of Lot #224 to Lot #227.
  • DSL Line Work:
    Another crew was engaged in DSL line work.

Technician Signature / DateAminullah Azimi, December 13, 2024
Reviewer Name / DateKenneth Mosman, January 11, 2025