Skip to content

Daily Field Report

Date :01/08/2025
Project No :2024C168
Client Company :CCG
Arrival Time :01/08/2025 8:00
Onsite Hours :05:30
Name of the Project :Reserve @ Gum Springs
Project Location :Jefferson
Weather :sunny
Departure Time :01/08/2025 13:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed:

Scope of Inspection:

  • Inspected installation of Redi Rock Retaining Wall #1 and monitored progress at the project entrance.
  • Verified compliance with project drawings, specifications, and applicable codes.

Key Observations:

 Installation of Retaining Wall #1 Work:

    • Redi Rock Retaining Wall #1 at the creek crossing between Station 0+15 to 0+95:
      • Application of base course material (No. 57 crushed stone).
      • Placement of Geo-Grid for wall construction integrity.

Conclusion:
The inspection confirms compliance with the specified requirements. Testing data supports the quality and adherence to project standards in the observed construction activities.

ASEC remains available to provide further clarification or discuss any aspects of this report

Technician Signature / DateAminullah Azimi, January 8, 2025
Reviewer Name / DateKenneth Mosman, January 17, 2025