Skip to content

Daily Field Report

Date :01/23/2025
Project No :2025C106
Client Company :Paragon Construction & Development, Inc.
Arrival Time :01/23/2025 11:00
Onsite Hours :02:30
Name of the Project :Strickland Brothers-Villa Rica
Project Location :800 Highway 61, Villa Rica, Carroll County, Georgia
Weather :Cold
Departure Time :01/23/2025 13:30
ASEC Technician Name :Micah Aycock

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of performing a visual foundation inspection to verify the building foundations (lift pits and continuous wall footings) soil bearing pressure.  Testing was performed for the new Strickland Brothers 10 Minute Oil Change facility located at 800 Highway 61 in Villa Rica, Georgia.

Testing performed included Dynamic Cone Penetrometer (DCP) testing along with general probing using a 3/8″ diameter probe rod.  One (1) DCP test was performed in each of the three (3) lift pits and one (1) test was performed along the north wall continuous footing line, about halfway.  Originally, the ground in the wall footings was too hard to hand auger due to the recent stretch of cold temperatures.  Our representative had the contractor excavate down 1.5 feet in the center of the north wall and then performed our hand auger/DCP testing from that point.  Results of our DCP testing are presented in the tables below.

Following all DCP testing and general probing, we found the subgrade within the continuous wall and lift pit foundations appears to be suitable to support a soil bearing pressure of 2,500 psf and, therefore, meets job specifications for design footing bearing pressures.

Please feel free to contact us if you have any questions or require further clarification regarding this report.

DCP LOCATION: Lift Pit #1 (south most pit)
Lift Pit
Depth Set N Description
(feet) 2″ 1.75″
1 13 Red, Silty fine to medium SAND
2 14 Red, Silty fine to medium SAND
3 14 Red, Silty fine to medium SAND
DCP LOCATION: North wall footing, approximate center
Wall Footing
Depth Set N Description
(feet) 2″ 1.75″
1 13 Red, Silty fine to medium SAND
2 15 Red, Silty fine to medium SAND
3 11 Red, Silty fine to medium SAND
DCP LOCATION: Lift Pit #2 (center pit)
Lift Pit
Depth Set N Description
(feet) 2″ 1.75″
1 20 Red, Silty fine to medium SAND
2 12 Red, Silty fine to medium SAND
3 11 Red, Silty fine to medium SAND
DCP LOCATION: Lift Pit #3 (north most pit)
Lift Pit
Depth Set N Description
(feet) 2″ 1.75″
1 15 Red, Silty fine to medium SAND
2 12 Red, Silty fine to medium SAND
3 11 Red, Silty fine to medium SAND

Looking from the southwest corner of building.

One of the lift pits.

Another view of the lift pits.

Corner of one of the lift pits.

Framing in one of the lift pits.

Looking at the lift pits from the south.

Contractor used excavator to scrape down 1.5 feet of hardened ground from the surface in order to perform hand auger/DCP test.

Technician Signature / DateMicah Aycock, January 23, 2025
Reviewer Name / DateRamchandra Mogulla, January 24, 2025