Daily Field Report

Date :01/24/2025
Project No :2024C315
Client Company :J. Chapman Const.
Arrival Time :01/24/2025 8:00
Onsite Hours :08:00
Name of the Project :Cottages at Villa Rica - Rock Blasting
Project Location :Villa Rica
Weather :cold
Departure Time :01/24/2025 16:00
ASEC Technician Name :Mahendra Mylabathula

Observations/Finding

The aforementioned AS Engineering and Consulting (ASEC) representative visited the Cottages at Villa Rica site to monitor drilling and rock removal operations. The contractor performing the work was Precision Blasting. The following observations were made on-site:

Drilling Data:

The drilling operation began at the southern end of Lot 48, where blasting holes had previously been completed. The crew proceeded westward until reaching the start of the lateral section, specifically Lateral 124, south of Lot 45. Throughout the process, no significant issues were encountered, and the crew did not face any notable groundwater challenges. Each hole was carefully inspected after drilling to ensure the correct depth was achieved. Drilling in this area was performed with rows spaced approximately 8 feet apart and 7 feet between drilling locations within each row. The operation progressed smoothly with no major complications.

Location:
Drilling took place south of Lot 45 and north of Lateral 124, at the point where the lateral section begins.

A layout drawing showing the approximate area where drilling was performed on this day is attached to this report.

We appreciate the opportunity to assist you with this project. Should you have any questions regarding this report, please do not hesitate to contact us. We would be happy to discuss it with you.

Technician Signature / DateMahendra Mylabathula, January 24, 2025
Reviewer Name / DateRamchandra Mogulla, January 28, 2025