- Home
- Density Test Report Report ID: 76678
- Edit Download Report
Density Test Report
Date :01/31/2025
Project No :2024C202
Client Company :CCG
Arrival Time :01/31/2025 08:00
Onsite Hours :
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :Cloudy and drizzle
Departure Time :01/31/2025
ASEC Technician Name :Solomon Cherie
Observations/Finding
| Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
|---|---|---|---|---|---|---|---|---|---|---|
| 01/31/2025 | 1 | 25.4 | 97.6 | S-02 | 97.2 | 24.9 | 100.4 | 95 | D6938 | Pass |
| Location : | Lot #31, Elv/Depth :at finished grade | |||||||||
| Comment : | Gauge Serial No. :30942 | |||||||||
| 01/31/2025 | 2 | 26.3 | 87.6 | S-02 | 97.2 | 24.9 | 90.1 | 95 | D6938 | Fail |
| Location : | Lot #29, Elv/Depth :10 feet below finished grade | |||||||||
| Comment : | Superintendent was notified that additional compactive effort was required in this area. | Gauge Serial No. :30942 | ||||||||
| 01/31/2025 | 03 | 27.4 | 87.5 | S-02 | 97.2 | 24.9 | 90.0 | 95 | D6938 | Fail |
| Location : | Lot #28, Elv/Depth :4 feet below finished grade | |||||||||
| Comment : | Superintendent was notified that additional compactive effort was required for the lots in this area. | Gauge Serial No. :30942 | ||||||||
Technician Signature / DateSolomon Cherie, January 31, 2025
Reviewer Name / DateKenneth Mosman, February 01, 2025
