Skip to content

Density Test Report

Date :01/31/2025
Project No :2024C202
Client Company :CCG
Arrival Time :01/31/2025 08:00
Onsite Hours :
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :Cloudy and drizzle
Departure Time :01/31/2025
ASEC Technician Name :Solomon Cherie

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/31/2025 1 25.4 97.6 S-02 97.2 24.9 100.4 95 D6938 Pass
Location : Lot #31, Elv/Depth :at finished grade
Comment : Gauge Serial No. :30942
01/31/2025 2 26.3 87.6 S-02 97.2 24.9 90.1 95 D6938 Fail
Location : Lot #29, Elv/Depth :10 feet below finished grade
Comment : Superintendent was notified that additional compactive effort was required in this area. Gauge Serial No. :30942
01/31/2025 03 27.4 87.5 S-02 97.2 24.9 90.0 95 D6938 Fail
Location : Lot #28, Elv/Depth :4 feet below finished grade
Comment : Superintendent was notified that additional compactive effort was required for the lots in this area. Gauge Serial No. :30942
Technician Signature / DateSolomon Cherie, January 31, 2025
Reviewer Name / DateKenneth Mosman, February 01, 2025