Daily Field Report
Date :02/03/2025
Project No :2024C297
Client Company :Artisan
Arrival Time :02/03/2025 15:00
Onsite Hours :02:00
Name of the Project :Nature Walk - Footing Inspections
Project Location :Dallas
Weather :sunny
Departure Time :02/03/2025 17:00
ASEC Technician Name :Vamsi Polisetty
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
- Savannah Pipe Works: Next to Lot #995 the contractor began the excavation of the trench for the underground drilling and piping system to be installed beneath the main road. The trench was initially excavated using a Kobelco SK 350LC excavator, with a trench box sized at 14′ x 38′. During the excavation, rock boulders were encountered at different depths along the trench. At one end of the trench, rock was observed at a depth of 10’6″, while at the opposite end, the rock was found at a depth below 5’6″. The contractor will need to break up the rock. Once this is completed, the excavation work will proceed the following day.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.























Technician Signature / DateVamsi Polisetty, February 3, 2025
Reviewer Name / DateKenneth Mosman, February 06, 2025