- Daily Field Report Report ID: 78104
- Edit Download Report
Daily Field Report
Observations/Finding
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed:
The excavating and backfilling activities were performed throughout the day. The cut was from a nearby area and was performed by a 349E CAT Excavator whereas the hauling was performed using two heavy duty 745C tandem-axled dump trucks. The fill was spread and compacted by a heavy duty 815F CAT compactor.
Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Results are attached in separate reports.
Please contact us if you have any questions regarding this report or of the density test results.
.

Picture showing lots ba killed and compacted during the day