Site Visit Report – Cottages at Villa Rica
An AS Engineering and Consulting (ASEC) representative visited the Cottages at Villa Rica site to monitor drilling and rock removal operations. The contractor performing the work was Precision Blasting. The following observations were made on-site:
Site Observations:
No drilling or blasting activities took place today. Precision Blasting informed us that they were waiting for surveyors to complete the mapping of the next drilling location, which was expected to occur later in the afternoon.
The site visit, including travel time, accounted for two hours.