Site Visit Report – Cottages at Villa Rica
An AS Engineering and Consulting (ASEC) representative visited the Cottages at Villa Rica site to monitor drilling and rock removal operations. The contractor performing the work was Precision Blasting. The following observations were made on-site:
Drilling Data:
Today, the drilling team continued working on the mass rock pattern in the northeast corner of the development. Drilling began at Lot #55 and progressed south toward Lot #56. The hole spacing remained consistent at 6 feet throughout the operation.
The attached plan sketch shows the general area drilling was performed.
We appreciate the opportunity to assist with this project. If you have any questions regarding this report, please do not hesitate to contact us. We would be happy to discuss any details further.