- Daily Field Report Report ID: 79226
- This project is inactive from admin. Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
The work has commenced behind Lots #225, 226, and 227. The excavation for the retaining wall has been initiated, with a cut being made using a Kobelco SK300LC excavator. The contractor has successfully removed soft grey soils to suitable, stable soils.
The excavated material is being moved using a CAT 725 truck, and compaction is being carried out with a Bomag sheep’s foot compactor. Additionally, general probing has been performed to verify the stability of the underlying strata.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.