Density Test Report

Date :04/02/2025
Project No :2024C202
Client Company :CCG
Arrival Time :04/02/2025 07:30
Onsite Hours :
Name of the Project :Old Griffin Rd - Hawthorne Reserve
Project Location :Dallas
Weather :
Departure Time :
ASEC Technician Name :

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/02/2025 1 31 88.1 ASECP006 92.1 27.0 95.7 95 D6938 Pass
Location : Lot #49, Elv/Depth :6 feet below finished grade
Comment : In-situ moisture contents are much higher than optimum. Gauge Serial No. :30942
04/02/2025 2 31.0 89.6 ASECP006 92.1 27.0 97.3 95 D6938 Pass
Location : Lot #48, Elv/Depth :3 feet below finished grade
Comment : In-situ moisture contents are much higher than optimum. Gauge Serial No. :
Technician Signature / DateSolomon Cherie, April 2, 2025
Reviewer Name / DateKenneth Mosman, May 01, 2025