- Home
- Daily Field Report Report ID: 79717
- This project is inactive from admin. Download Report
Daily Field Report
Date :03/19/2025
Project No :2024C213
Client Company :WDG
Arrival Time :03/19/2025 10:30
Onsite Hours :05:30
Name of the Project :Covington Town Center PH II
Project Location :Covington, GA
Weather :sunny
Departure Time :03/19/2025 16:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
As requested, a representative from AS Engineering and Consulting (ASEC) visited the site to perform quality control inspection and testing services. Visual observation techniques were used to verify compliance with project drawings, specifications, applicable codes, and approved material submittals.
On this day, the undersigned was present to observe soil placement and perform testing; however, the area was not ready for testing at the time of inspection. Drilling activities were performed between stations MHA0 and MHA1.
Please contact us if you have any questions regarding this report.




Technician Signature / DateAminullah Azimi, March 19, 2025
Reviewer Name / DateKenneth Mosman, April 29, 2025
