Density Test Report

Date :03/20/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :03/20/2025 9:00
Onsite Hours :9:00
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :cloudy
Departure Time :03/20/2025 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/20/2025 1 23.1 120.7 ASECP002 99.4 22.4 98.7 95 D6938 Pass
Location : Pond 1, perimeter (location is shown in daily report) , Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
03/20/2025 2 24.2 97.1 ASECP002 99.4 22.4 97.7 95 D6938 Pass
Location : Pond 1, perimeter (location is shown in daily report) , Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :8579
03/20/2025 3 24.1 95.6 ASECP002 99.4 22.4 96.2 95 D6938 Pass
Location : Pond 1, perimeter (location is shown in daily report) , Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
03/20/2025 4 25.6 97.2 ASECP002 99.4 22.4 97.8 95 D6938 Pass
Location : Pond 1, perimeter (location is shown in daily report) , Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 20, 2025
Reviewer Name / DateKenneth Mosman, April 29, 2025