Density Test Report

Date :03/21/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :03/21/2025 8:30
Onsite Hours :9:30
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :cloudy
Departure Time :03/21/2025 18:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/21/2025 1 23.6 120.3 ASECP002 99.4 22.4 97.9 95 D6938 Pass
Location : Pond 1 perimeter (location is shown in daily report), Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
03/21/2025 2 23.2 97.0 ASECP002 99.4 22.4 97.6 95 D6938 Pass
Location : Pond 1 perimeter (location is shown in daily report), Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
03/21/2025 3 24.2 98.3 ASECP002 99.4 22.4 98.9 95 D6938 Pass
Location : Pond 1 perimeter (location is shown in daily report), Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
03/21/2025 4 25 97.6 ASECP002 99.4 22.4 98.2 95 D6938 Pass
Location : Pond 1 perimeter (location is shown in daily report), Elv/Depth :2 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 21, 2025
Reviewer Name / DateKenneth Mosman, April 29, 2025