- Home
- Daily Field Report Report ID: 79850
- This project is inactive from admin. Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
Our ASEC representative was on site as requested by the contractor (Wilbanks) for the observation/testing of soil being placed in approximately 8-inch lifts on Lots #120 and #121. The soil was tested for moisture content, which showed to be too high for proper compaction and it was recommended to the contractor to place one layer of fill and allow ample time to aerate to near optimum moisture content prior to recompaction. The technician also tested for compaction around the OCP that was installed in the retention pond by Lots #140 – #143 on right side of the site.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

OCP

fill on lots 120 and 121

OCP

OCP
