Skip to content

Density Test Report

Date :03/29/2025
Project No :2025C146
Client Company :Davidson Homes, LLC
Arrival Time :03/29/2025 9:30
Onsite Hours :07:00
Name of the Project :Greene Farms Subdivision
Project Location :1451 Highway 113, Cartersville, Georgia
Weather :sunny
Departure Time :03/29/2025 16:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/29/2025 1 17.1 127.0 ASECP003 109.2 18.5 99.4 95 D6938 Pass
Location : road (location as shown in daily report), Elv/Depth :0.5 foot below finished grade
Comment : Gauge Serial No. :85759
03/29/2025 2 16.9 109.0 ASECP003 109.2 18.5 99.8 95 D6938 Pass
Location : road (location is shown in daily report), Elv/Depth :0.5 foot below finished grade
Comment : Gauge Serial No. :85759
03/29/2025 3 17.1 126.1 ASECP003 109.2 18.5 98.6 95 D6938 Pass
Location : road (location is shown in daily report), Elv/Depth :0.5 foot below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, March 29, 2025
Reviewer Name / DateKenneth Mosman, May 01, 2025